Five steps, named deliverables, timelines in weeks. You can stop after any step and own everything produced so far.

  1. 01

    ASSESSMENT

    • Current-state report
    • Risk list
    • Concept design
    free · 3 business days to concept
  2. 02

    REFERENCE DESIGN

    • Engineered design
    • Architecture diagrams
    • Sizing + phasing plan
    7–10 business days (paid)
  3. 03

    BOM + TOR-READY SPEC

    • Line-item BOM with lead times
    • TOR technical annex
    • Acceptance criteria
    1 week
  4. 04

    DEPLOYMENT

    • Staged cutover plan
    • Installed + configured infrastructure
    • Acceptance test report
    per sizing band, stated up front
  5. 05

    MANAGED SUPPORT

    • Runbook
    • Support tier contract
    • Quarterly review
    ongoing