A data centre is a land and energy problem before it is a network problem.
EEC INDUSTRIAL LANDAvailable through the group
RENEWABLE GENERATION44.7 MW in development
AI FABRIC800G, SONiC — designed by Photon State
For sovereign-AI and hyperscale-adjacent projects, we can bring the site, the power path and the fabric to the same table.
ON THE RECORD IN THIS SECTOR
01/03
SAKURA Internet (SAKURAONE)
JAPAN · 2024
24 SWITCHES
RACKS
SONiC
SAKURA Internet built its 800-GPU SAKURAONE AI cluster on Edgecore AIS800-64O 800GbE switches running SONiC, arranged as a rail-optimized leaf-spine fabric with RoCEv2 in place of InfiniBand. It debuted at #49 on the June 2025 Top500 — per SAKURA's own researchers, the only system in the top 100 on a fully open networking stack — and stands at #69 on the June 2026 list.
Edgecore contributed its ORv3 immersion-capable switch to a single-phase immersion cooling proof of concept at Stellium Data Centers in Newcastle, built with Submer tanks and Circle B server integration under OCP principles. The deployment is a PoC — the first ORv3 immersion showcase in Europe — not a stated production rollout.
03/03
HyperVerge
INDIA · 2026
SWITCHES
RACKS
SONiC · BROADCOM SILICON
AI verification company HyperVerge deployed Edgecore high-bandwidth data center switches running SONiC to interconnect its GPU training cluster and a clustered NVMe parallel file system for face-recognition, OCR, and custom LLM workloads. The company reports its 100G RoCEv2 lossless fabric delivers the pooled storage at close to local-NVMe latency, and that open standards let its team self-configure and monitor the network quickly.